3MG UNDERGROUND RESERVOIR CUM BOOSTER PUMPING STATION AT SALTLAKE

DETAILED DESIGN, DRAWING, CONSTRUCTION AND COMMISSIONING OF CLEAR WATER UNDERGROUND RESERVOIR OF 3 MG CAPACITY, TOGETHER WITH PUMP HOUSE ON UGR, SUBSTATION BUILDING INCLUDING SUPPLY AND INSTALLATION OF RELATED ELECTRO-MECHANICAL WORKS OVER PILE FOUNDATION ALONG WITH TRIAL RUN FOR 3 MONTHS AND SUBSEQUENT OPERATION & MAINTENANCE FOR 12 MONTHS ADJACENT TO TANK NO. 5, AF BLOCK UNDER BIDHANNAGAR MUNICIPAL CORPORATION ARE ON TURNKEY BASIS UNDER AMRUT.

10.84 MLD WATER TREATMENT PLANT AT UTTARPARA

DESIGN, CONSTRUCTION OF A COMPLETELY SCADA BASED AUTOMATED, ENERGY EFFICIENT WATER TREATMENT PLANT HAVING FINAL OUTPUT/PRODUCTION CAPACITY OF 10.84 MLD IN 20 HOURS PLANT OPERATION DURATION/PERIOD PER DAY ON TURNKEY BASIS FOR UTTARPARA-KORTRUNG MUNICIPALITY.

GODREJ WATERSIDE – COMMERCIAL PROJECT

Shoring and Strutting works with full excavation including Sheet Piling work for Godrej Waterside Project at Sector – V, Salt Lake City, Kolkata.

BHAGYASHREE COTTON MILL

Construction of large Raw Sewage Pumping Station having 12.5 Meter Dia RCC Well on trun-key basis including remaining work of Raw Sewage Lifting Station under the Ganga Action Plan with rectification of 11.5 meter Dia Well

STATE BANK OF INDIA OFFICE BUILDING

Piling work for Construction for Multistoried Office Building Complex for State Bank of India at Strand Bank Road, Kolkata.

HILAND PARK MALL

Fabrication and Erection of Structural Steel Girders including all consumables with necessary lifting tools and tackles, two coats of Red-Oxide Zinc Chromate primer etc.complete for HILAND PARK MALL

URANIUM ORE PROCESSING PLANT

Civil Construction works including supply of all materials for Uranium Ore Processing Plant (UCT – 2) of Uranium Corporation of India Limited at Turamdih, Jharkhand.

SRIRAMPUR II – 27 MLD RAW WATER INTAKE JETTY

“Design, Construction and Commissioning of R.C.C. Intake Jetty with Pump House mounted on the Jetty Head along with Sub-Station Building all Civil and Electro-Mechanical works complete, in the location of the existing Intake Jetty of Srirampore Municipality by side of River Ganga and supplying and laying of 500 mm dia M.S. raw water rising main from Raw Water Intake Jetty upto 3 mtr. from the Inlet Well of the proposed W.T.P. with trial run for 3 months and Operation and Maintenance for a period of 12 months after commissioning of the Project on turnkey basis within Srirampore Municipal Area under AMRUT.(2nd Call).

SRIRAMPUR I – RAW WATER INTAKE JETTY

Design, Construction, Strengthening, Augmentation and Commssioning of R.C.C. Intake Jetty with Pump House mounted on the Jetty Head along with Sub-station building all Civil and Electro-Mechanical works complete, by side of River Ganga and supplying and laying of 500 mm dia M.S. Raw Water Rising Main from existing Raw Water Intake Jetty location of Howrah Water Works located at Srirampur to 5 Mtr. from the Inlet Sump of the proposed W.T.P. with trial run for 3 months and Operation and Maintenance for a period of 12 months after commissioning of the Project on Turnkey basis under State Fund

PUJALI RAW WATER INTAKE JETTY

Design, Drawing, Construction and commissioning of R.C.C Intake Jetty with pump House mounted on the Jetty along with Sub-station Building (incorporated in jetty complex) all civil and Electromechanicl works complete, by the side of river Ganga under pujali Municipality and lying of 400mm diameter M.S.Raw water Rising Main from Raw water Intake Jetty to Pujali water Treatment plant and operation and maintenance for a period of 12 months after commissioning of the project under Pujali Municipality on trunkey basis