SRIRAMPUR II – 27 MLD RAW WATER INTAKE JETTY
“Design, Construction and Commissioning of R.C.C. Intake Jetty with Pump House mounted on the Jetty Head along with Sub-Station Building all Civil and Electro-Mechanical works complete, in the location of the existing Intake Jetty of Srirampore Municipality by side of River Ganga and supplying and laying of 500 mm dia M.S. raw water rising main from Raw Water Intake Jetty upto 3 mtr. from the Inlet Well of the proposed W.T.P. with trial run for 3 months and Operation and Maintenance for a period of 12 months after commissioning of the Project on turnkey basis within Srirampore Municipal Area under AMRUT.(2nd Call).
“Design, Construction and Commissioning of R.C.C. Intake Jetty with Pump House mounted on the Jetty Head along with Sub-Station Building all Civil and Electro-Mechanical works complete, in the location of the existing Intake Jetty of Srirampore Municipality by side of River Ganga and supplying and laying of 500 mm dia M.S. raw water rising main from Raw Water Intake Jetty upto 3 mtr. from the Inlet Well of the proposed W.T.P. with trial run for 3 months and Operation and Maintenance for a period of 12 months after commissioning of the Project on turnkey basis within Srirampore Municipal Area under AMRUT.(2nd Call).