SEWAGE TREATMENT PLANT

Construction of Low Cost Sewage Treatment Plant (STP-II, Western Part) with R.C.C. retaining wall including ancillary works at Mangal Pandey Udyan in Barrackpur Town.

BHOGNIPUR FLYOVER

Construction of the Flyover at KM. 421.60 and KM. 425.20 on NH-2 and underpass at KM. 244.20 on NH-25 at Bhognipur, Kanpur, Dehat, Utter Pradesh.

RAJASTHAN ROAD PROJECT

Execution of Bituminous Macadam 7.5 CM thick, Dense Bituminous Macadam 10 CM thick and asphalt concrete 4.0 CM thick consolidated with HMP mix including cleaning of road surface and laying of tack coat, laying by paver finisher and rolling for surfacing works in between KM 16.00 to KM 25.89 on Road Hanumangarh – Sangaria at Bikaner, Rajasthan.

METRO RAILWAYS PROJECT

Construction of Pile Foundation and general Structural Works in Column, Beams, Slabs, etc. for Naktala Metro Station across Tolly Nullah for the extension of Metro Railway, Kolkata from Tollygunge to Garia.

METRO RAILWAYS PROJECT

Construction of Pile Foundation and Sub- Structure for extension of Metro Railway form Tollygunge to Garia at Kolkata between CH-3350 M to CH-4375 under Metro Railway, Kolkata.

CIRCULAR RAILWAY PROJECT

Construction of Pile Foundation and Sub – Structure work consisting of Cast-in-situ 600 mm dia bored piles, Pile Caps, Trestle Columns & Trestle Beams in connection with proposed Railway line from Dum Dum Cantonment Railway Station to Netaji Subhas Chandra Bose Airport, Kolkata.

INDIAN STATISTICAL INSTITUTE SUBWAY

Construction of Underground Reinforced Cement Concrete Pedestrain Subway in between 204 & 205 B.T. Road Campus of Indian Statistical Institute, Kolkata.

GHAZIABAD BRIDGE PROJECT

Construction of 2 Nos. Road Bridges near Br. No.18 across Mat Canal at KM 12/745 and Br. No.17 across Kalda distributory at KM 10/677 of Vidyut Nagar, Gaziabad.

JOGIGHOPA BRIDGE

Construction including (1.2 meter) diameter bored pile foundations,casting and launching of 30 meter span pre-stressed concrete girders on tall piers of 420 meter long Viaduct.

MS WATER MAIN – TRENCH LESS LAYING

Diversion and re-laying of 300 mm dia M.S. water main at the junction of Goragacha Road and Diamond Harbour Road with the help of Trench less technology by machine to facilitate construction of Taratala Fly over.

GRWW PUMP HOUSE

Design and Construction of Clear Water Pump House including connection with the existing Clear Water Reservoir for 1200 CuM per hour capacity, Garden Reach Water Treatment Plant (Phase – II), Bidhannagar, Kolkata.

FALTA – CONTAINER HANDLING CRANE

Design, Fabrication, Erection and Commissioning of Container Handling Crane for TEE HEAD JETTY at Falta Export Processing Zone.

SOIL STABILIZATION

Soil Stabilization by installation of stone columns & construction of sand pad foundation for vertical tanks at Budge Budge Terminal. Kolkata.

RISHRA PASSENGER JETTY

1. Construction of RCC Bored Piles (600mm Dia).
2. Supply fabrication & Installation of a Steel Foot Bridge of 30 metre span.
3. Installation of M.S Floating Pontoon and Yoke Assembly and M.S Sloping Gangway
4. Construction of Infrastructure Facilities including Passenger’s Rest shed,Booking counter,Toilet,Telephone booth with electrical Installations.